What preconstruction information should a facilities manager supply for render work?
Give the project team a usable account of the building: relevant records, known hazards, service restrictions and the people who can answer the remaining questions.

A facilities manager may hold the information that makes a rendering proposal workable, but it can be scattered between maintenance folders, old drawings and staff knowledge. Start by identifying what the proposed work will disturb and who needs the information. The aim is to assemble the relevant material into a clear issue, with gaps and outdated records visible. It is not to send every file held for the estate or to write the contractor’s method statement. A concise building-specific account allows the appointed designers and contractors to plan their own responsibilities with a better understanding of the premises.
Know which information belongs to the client
HSE’s L153 guidance describes pre-construction information as relevant project information already held by, or reasonably obtainable for, the client. It should be proportionate and developed as the design progresses. The facilities manager can help locate and explain it, but the project appointments should establish who reviews it and who formally provides it to the designers and contractors.
Separate that information from the construction phase plan and the contractor’s detailed working arrangements. A record showing live equipment beside a proposed work area tells the contractor about a constraint; it does not decide the safe method of working beside it. Likewise, an existing access rule needs to reach the construction team so it can plan, rather than being mistaken for a complete project risk assessment.
For projects involving more than one contractor, HSE identifies the principal designer’s role in helping the client bring pre-construction information together. Arrange an early discussion about the actual project and the gaps in the records. The manager’s knowledge of the building is useful input to that process, particularly where the files do not explain how a space is used.
Assemble the wall’s history, with its limitations
Locate drawings of the building and any later alterations affecting the proposed elevations. Include relevant specifications, inspection reports, repair records and information from earlier work. Label each document by date and status. A tender drawing, an as-built record and a maintenance sketch can all help, but they do not carry the same meaning.
Add a short explanation of changes known to the premises team. A replacement sign, blocked opening or altered downpipe may not appear on the original drawings. Mark its location and identify any supporting record. Where the information comes from staff recollection, describe it as such and give the project team a route to check it.
Avoid silently resolving a disagreement between records. If a drawing shows one arrangement and a recent photograph appears to show another, include both and identify the question. The responsible team can decide what inspection is needed. Removing the inconvenient document or choosing the newest date without checking its scope can hide the very uncertainty the project needs to address.

Explain what the asbestos information actually covers
Provide the relevant survey, register and management information, including the document’s plans and exclusions. The report title alone is insufficient. HSE explains that a management survey supports normal occupation, while refurbishment and demolition surveys address work involving hidden materials. Have the competent people assess whether the available information covers the intended disturbance.
Identify known inaccessible areas and changes made since the survey. If a previous report excluded the upper wall or a concealed junction, make that limitation easy to find. Do not turn a blank entry into a statement that no asbestos is present. The designer and contractor need to know what has and has not been investigated before they rely on the record.
Confirm who can arrange any additional investigation and how it fits the information programme. Opening up for a façade survey can itself disturb material, so the issue arises before the main rendering work. Keep the resulting report linked to the affected elevation and distribute it to the people whose planning depends on the finding.
Identify services and the people controlling them
Show the relevant services on the available plans and explain their operating restrictions. These may include equipment fixed to the wall, intakes, outlets, cables, pipes or equipment whose operation must be coordinated with the work. State what is known about their function and ownership, and identify any services that have not been traced or confirmed.
Provide the contact and process for isolation or access decisions where those are required. A facilities manager may be able to request an outage without being the person authorised to carry it out. Make that distinction visible. The construction programme needs to allow for the actual approval and competent trade involvement rather than assuming an operative can disconnect an inconvenient fitting on arrival.
Explain the building’s existing permit arrangements where relevant to the proposed activities. Include the person issuing a permit, the information required and any restrictions or lead time that the premises actually applies. These site rules must be reconciled with the contractor’s assessed method. They should not be represented as evidence that a construction activity is safe merely because a form has been signed.
Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Client information | Purpose | Separate project decision |
|---|---|---|
| Existing wall records | Explains known construction and alterations | Designer decides investigation and specification |
| Survey exclusions | Identifies unexamined areas | Competent team defines further survey |
| Service and isolation records | Shows restrictions and control contacts | Responsible trade assesses and performs work |
| Premises permit rules | Explains the operator’s approval process | Contractor develops the working method |
| Occupancy and access requirements | Shows who may be affected | Project team agrees construction arrangements |
Describe the people using the premises
Give the team a practical account of entrances, pedestrian routes, deliveries and neighbouring activities. Include users who may need a different arrangement, such as children, visitors unfamiliar with the site or people relying on a particular accessible entrance. HSE’s public-protection guidance identifies boundaries, adjacent land use and access as information the client should provide.
For an education building, distinguish term-time patterns from holiday use. For an industrial property, explain shift changes and deliveries rather than providing only office opening hours. Record which details are confirmed and who controls later changes. An external work area that seems available during a survey may be needed for an activity booked by a different department.
Include emergency arrangements relevant to the affected area and identify who must be consulted before routes change. The construction team should assess any temporary arrangement through the project process. The information issue needs to make the existing requirement clear enough for that assessment; it should not prescribe a substitute route that has not been checked.

Issue a short index and an open-questions list
Put the information into a convenient form with a short index explaining what each item covers. Identify the current version and the relevant elevation or activity. HSE’s L153 guidance calls for information that is clear, concise and understandable. A large folder becomes more useful when the recipient can quickly find the survey for the particular wall and see its limitations.
Keep unanswered questions in a separate list with a named owner and required date. For example, an unconfirmed service route should lead to an action to establish it before the affected design or work stage. Record who needs the answer. This prevents an unresolved query being lost when the information pack is forwarded between tenderers, the appointed contractor and site supervisors.
Ask recipients to identify further information they need for their own responsibilities. The exchange should develop the brief rather than end with a receipt acknowledgement. If a contractor asks for a record that does not exist, say so and refer the need to the project team; do not create a confident description from an incomplete memory.
Keep changes moving to the right people
A later maintenance visit or a new survey can change information already issued. Record the change and send it to the people whose design or work is affected, with a clear reference to the superseded information. Confirm that the site team receives the update rather than assuming a revised file in the estate folder will be noticed automatically.
Call 01623 579297 to discuss a Nottinghamshire rendering project with the building use, affected areas and available records. Have the information index and the main unresolved questions ready. Agree how to provide the relevant documents during the call so the next discussion can concentrate on the work rather than locating the latest version of the drawings.
Questions and answers
Should the facilities manager write the contractor’s method statement?
The project appointments determine responsibility for developing the working method. The facilities manager should supply relevant building information and explain operational rules, then help the appointed team resolve questions. Providing those facts is different from designing or accepting a method outside that role.
What if the building records are incomplete?
List the gaps plainly and ask the client and appointed team what further information is needed. Existing records can still be useful when their limits are visible. Significant questions should lead to a defined investigation or decision before the activity that relies on them.
Sources and further reading
- HSE L153: Managing health and safety in constructionCrown copyright2015. HSE, Managing health and safety in construction, L153, first edition2015. Contains public sector information licensed under the Open Government Licence v3.0.Release/version: First published 2015Source checked: 2026-11-23T05:00:01.889096+00:00
- HSE: Principal designers under CDM 2015Contains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: 27 January 2026Source checked: 2026-11-23T05:00:01.889096+00:00
- HSE: arrange an asbestos surveyContains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: Updated 1 March 2021Source checked: 2026-11-23T04:17:09.028554+00:00
- HSE: protecting the publicContains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: Updated 22 June 2026Source checked: 2026-11-23T04:17:09.028554+00:00